The Town Council and/or the Town of Oro Valley Water Utility Director, at its discretion and option, may permit the construction of water facilities by a party other than the Town through the use of line extension agreements. The facilities shall be constructed at the sole expense of the party. These facilities may be constructed within roadways, avenues, alleys and within rights-of-way and easements and subject to payment of any permits, or other fees or charges, which are due the Town and its Water Utility. Facilities shall include, but are not limited to, wells, pumps, storage tanks and reservoirs, water mains, valves, hydrants, meters and other appurtenances to the water system both within the party’s proposed development as well as outside the development. It shall be any such configuration of the facilities deemed necessary or desirable by the Town Water Utility to meet design requirements and serve the new development. All titles, rights, or interests in the facilities shall be transferred to the Town of Oro Valley upon acceptance of fully constructed improvements. The party shall provide the Water Utility with the minimum following information: Approved construction plans (water plan); approval to construct issued by the Pima County Department of Environmental Quality; itemized invoices of the actual costs to construct; lien releases; proof of insurance; and, upon completion of construction, as-built plans of the project, recorded easements and applicable testing and inspection documentation. ((O)12-14, 09/19/2012; (O)00-05, 02/02/2000; (O)96-13, 03/25/1996)