Plans for construction of water facilities to be constructed by parties other than by the Town Water Utility shall be provided by the party, certified by a registered professional engineer, and approved by the Water Utility Director or the Director’s designee. The party shall be responsible to pre-pay water plan review fees and construction inspection fees as directed by the Town Water Utility. Construction of water facilities shall not start until a grading permit and/or right-of-way permit has been issued. The construction of water facilities, as authorized and approved by the Town Water Utility, shall be regularly inspected by the Water Utility, or its authorized agent, and shall comply with the engineering, construction, material, and installation standards adopted by the Town of Oro Valley. ((O)12-14, 09/19/2012; (O)00-26, 08/16/2000; (O)00-05, 02/02/2000; (O)96-13, 03/25/1996)