A. The Utility may require the oversizing of transmission lines that extend the water lines to the subject property. The Utility will refund the oversizing of a transmission line by reimbursing the participating party for the construction cost difference between what was required to deliver water to the subject property and what was requested to enhance the water system for future growth. Should a distribution main be requested to be oversized by the Utility, the Utility would use the same manner of refund as with an oversized transmission line.

B. The Water Utility Director may execute a line extension agreement with oversizing of facilities on behalf of the Town for oversizing refunds. ((O)12-14, 09/19/2012; (O)96-13, 03/25/1996)