Skip to main content
Loading…
This section is included in your selections.

The Water Utility Director or the Director’s designee may require the participating party to install “on-site” or “off-site” water facilities of a size greater than is required to provide service to the development or property. ((O)12-14, 09/19/2012; (O)96-13, 03/25/1996)